Tianjin Hangu Waste-to-energy Plant Project


Because the ash silo and reactor for a long time in a low temperature state, condensation of a large number of fly ash, while the dust has a certain corrosive. Will cause channel blockage corrosion of the outer wall, so the need for the lower part of the ash bin and reactor and related equipment and screw conveyor, chain conveyor to the bucket elevator pipeline and valves for heat accompaniment, to solve the waste incineration of fly ash condensation on the surface of the equipment.

Key words:

Tianjin Hangu Waste-to-energy Plant Project

Classification:

Electricity and water conservancy

Picture Name

Provide professional thermal control system engineering technical advice, engineering planning, system design, installation and commissioning, operation and maintenance!

  • Description
    • Commodity name: Tianjin Hangu Waste-to-energy Plant Project

    Because the ash silo and reactor for a long time in a low temperature state, condensation of a large number of fly ash, while the dust has a certain corrosive. Will cause channel blockage corrosion of the outer wall, so the need for the lower part of the ash bin and reactor and related equipment and screw conveyor, chain conveyor to the bucket elevator pipeline and valves for heat accompaniment, to solve the waste incineration of fly ash condensation on the surface of the equipment.

     

    ►Project Name: Tianjin Hangu Waste-to-energy Plant Project

    ►Project Location: Hangu Port, Binhai New Area, Tianjin

    ►Application main product name: MI mineral insulated electric heating cable

    ►Number of projects used: 3800 meters

    ►Solution to project requirements: Heating and temperature maintenance of conveying pipelines and ash hoppers. 

    ►Scope of service: design, supply, guidance, installation, commissioning, maintenance. 

    ►User reviews:★★★★★

    ►Project introduction: Tianjin Binhai New Area Hangu Waste-to-energy Power Plant Binhai New Area No. 1 Waste-to-energy Plant is located in Chadian Town, southwest of Hangu, between Tanghan Road and Tanghan Expressway. The project is divided into two phases of construction, the first phase of the project will process 1,500 tons of domestic waste per day, and finally reach 2,000 tons of domestic waste per day. 

    The total investment of the project is 807 million yuan, and the main equipment of the first phase of the project adopts three reciprocating grate incinerators produced by Keppel Sieges of Belgium and C12-3.80/1.4 extraction steam turbine units produced by Hangzhou Steam Turbine Factory. The designed annual power generation capacity of the first phase of the project is 1. 500 million kWh, with an annual on-grid electricity of 120 million kWh, is equivalent to saving 80,000 tons of standard coal every year.

    Because the ash bin and reactor have been in a low temperature state for a long time, a large amount of fly ash has been condensed, and the dust has a certain corrosiveness. It will cause the channel to block and corrode the outer wall, so it is necessary to trace the heat of the ash bin and the lower part of the reactor and related equipment, as well as the pipes and valves of the screw conveyor, chain conveyor to bucket elevator, so as to solve the problem of fly ash condensation on the surface of the equipment after waste incineration.

     

     

    ►Project Application:

    After receiving the Tianjin Hangu Waste Incineration Power Plant project, through on-site investigation and understanding of the local climate and environment, combined with the actual requirements of users, the technical staff of our company designed a complete set of special electric heat tracing insulation heating system according to the working temperature requirements of ash hoppers and pipelines in different environments, which stabilized the work.

    Tianjin Hangu Waste Incineration Power Plant project selection, design and installation are completed by our company, now the project has been completed, and the commissioning and operation is normal, which solves the problem that the ash hopper of the first waste incineration power plant in Binhai New Area, Tianjin Binhai New Area, is too low for a long time during operation, resulting in fly ash condensation blocking the transmission pipeline and corroding the ash hopper. We will also continue to strive to provide customers with satisfactory electric heat tracing antifreeze insulation technical services.

     

     

    ►Project Drawings:

     

     

    Key words:
    • Tianjin Hangu Waste-to-energy Plant Project

Previous Page

Next Page

Previous Page

None

Next Page

Engineering Inquiry

Related Products