Urumqi Olympic Sports Center Project Roof Snow Melting and Ice Melting Project


In winter, because of the temperature is relatively low meets the rain and snow freezing weather, the gutter roof will form the snow accumulation and the snow water freezing is difficult to melt, causes the drainage system to face the paralysis, the prolonged time will cause the influence to the building. So use the electric accompanies the tropical heat preservation measure to carry on the roof to melt the snow to melt the ice way, solves this kind of problem.

Key words:

Urumqi Olympic Sports Center Project Roof Snow Melting and Ice Melting Project

Classification:

Building fire protection

Picture Name

Provide professional thermal control system engineering technical advice, engineering planning, system design, installation and commissioning, operation and maintenance!

  • Description
    • Commodity name: Urumqi Olympic Sports Center Project Roof Snow Melting and Ice Melting Project

    In winter, because of the temperature is relatively low meets the rain and snow freezing weather, the gutter roof will form the snow accumulation and the snow water freezing is difficult to melt, causes the drainage system to face the paralysis, the prolonged time will cause the influence to the building. So use the electric accompanies the tropical heat preservation measure to carry on the roof to melt the snow to melt the ice way, solves this kind of problem.

    ►Project Name: Urumqi Olympic Sports Center Project Roof Snow Melting and Ice Melting Project

    ►Project location: Urumqi, Xinjiang

    ►Application main product name: self-limiting temperature electric heat tracing

    ►Number of projects used: 20,000 meters

    ►Solution to project requirements: melting snow and ice. 

    ►Scope of service: design, supply, guidance, installation, commissioning, maintenance. 

    ►User reviews:★★★★★

    ►Project introduction: Urumqi Olympic Sports Center project is located in the south of the east extension of Kashgar Road and the east of the north extension of Huizhan Avenue in Midong District, covering an area of 480 acres (320,000 square meters), with a total construction area of about 305,700 square meters and a total investment of 3.8 billion yuan. 

    In winter, due to the relatively low temperature, rain, snow and freezing weather, the roof of the gutter will form snow accumulation and snow water freezing is difficult to melt, so that the drainage system is paralyzed, which will affect the building for a long time. Therefore, the use of electric heat tracing insulation measures to melt snow and ice on the roof solves this problem.

    ►Project Application:

    After receiving the roof snow melting and ice melting project of Urumqi Olympic Sports Center project, Tianjin Yatailong Thermal Control has designed a complete set of special electric heat tracing snow melting and ice melting system according to the size requirements of gutters and roofs in different environments, which has stabilized the work efficiency.

    The selection, design, installation and commissioning of the roofing snow melting and ice melting project of the Urumqi Olympic Sports Center project were completed by our company, and now the project has been completed and the commissioning is running normally, which solves the problem of the roof melting snow and ice of the Urumqi Olympic Sports Center project in winter because the temperature is too low, causing the roof gutter to freeze and affecting the drainage of the factory roof gutter. We will also continue to strive to provide customers with satisfactory electric heat tracing antifreeze insulation technical services.

     

    ►Project Drawings:

    Key words:
    • Urumqi Olympic Sports Center Project Roof Snow Melting and Ice Melting Project