Comparison between the electric heating cable gutter snow and ice melting system and the traditional project:

1. Construction:

① The electric heating gutter ice melting system has simple construction and short construction period.

② The traditional gutter snow-melting and ice-melting system has complex construction, long construction period and high-altitude operations.

2. Safety:

①The electric heating gutter ice melting system has double-layer protection, high electrical safety factor, and is waterproof, UV-resistant and aging-resistant.

② The traditional gutter snow-melting and ice-melting system has grounding protection, with a cement mortar backfill layer (protective iron sheet and waterproof membrane) to prevent the heating cable from contacting the air and prevent aging.

3. Maintenance:

①The electric heating gutter snow melting device is replaceable and easy to maintain.

② Traditional snow melting systems are prone to aging, burning out, etc., and are difficult to replace and operate.

4. Self-respect:

①The electric heating gutter is light in weight and suitable for buildings with light steel structures.