Picture Name

400-624-8818

--Service hotline——

+
  • 刘园地铁站业绩图.png

Tianjin Metro Line 1 Liu Yuan Parking Lot Reconstruction and Expansion Project


Firefighting pipework is a key factor in the safety of the entire metro. Avoiding freezing or frost cracking of pipes in the metro requires insulation and anti-freezing measures for its pipes so that the metro can operate normally even in cold conditions.

Key words:

Tianjin Metro Line 1 Liu Yuan Parking Lot Reconstruction and Expansion Project

Classification:

Metro

Picture Name

Provide professional thermal control system engineering technical advice, engineering planning, system design, installation and commissioning, operation and maintenance!

  • Description
    • Commodity name: Tianjin Metro Line 1 Liu Yuan Parking Lot Reconstruction and Expansion Project

    Firefighting pipework is a key factor in the safety of the entire metro. Avoiding freezing or frost cracking of pipes in the metro requires insulation and anti-freezing measures for its pipes so that the metro can operate normally even in cold conditions.

     

    ►Project Name:Tianjin Metro Line 1 Liuyuan Parking Lot Reconstruction and Expansion Project

    ►Project location: Tianjin

    ►Application main product name: self-limiting temperature electric heat tracing

    ►Number of projects used: 8000 meters

    ►Solution to project requirements: fire protection, water supply pipelines. 

    ►Scope of service: design, supply, guidance, installation, commissioning, maintenance. 

    ►User reviews: ★★★★★

    ►Project introduction: As a high-volume rapid urban public transportation system used to carry urban commuter passengers, the subway plays the role of the backbone of urban transportation. However, with the advent of winter, especially in the cold areas of the north, the entrance and exit of the subway, the air duct, the air duct and the hole of the section, as well as the water supply and drainage pipes in the station are very susceptible to frost damage, and once the drainage pipes of the subway are frozen and blocked, it will directly affect the normal operation of the subway station. Among them, the fire pipe is a key factor affecting the safety of the entire subway. Therefore, to avoid freezing or freezing of the pipes in the subway, it is necessary to take thermal insulation and anti-freezing measures for the pipes, so that the subway can operate normally under cold conditions. 

     

     

    ►Project Application:After receiving the reconstruction and expansion project of Liuyuan Parking Lot of Tianjin Metro Line 1, Tianjin Yatailong Thermal Control has designed a complete set of special electric heat tracing insulation heating system according to the working temperature requirements of pipelines in different environments, which has stabilized the work efficiency.

    Tianjin Metro Line 1 Liu Yuan Parking Lot Reconstruction and Expansion Project Selection Design and Installation are completed by our company, now the project has been completed, and the commissioning and operation is normal, which solves the problem that Tianjin Metro Line 1 is in the process of operation because the temperature is too low, resulting in the freezing and blocking of the fire pipeline, affecting the normal operation of the subway. We will also continue to strive to provide customers with satisfactory electric heat tracing antifreeze insulation technical services.

    ►Project Drawings:

     

     

    Key words:
    • Tianjin Metro Line 1 Liu Yuan Parking Lot Reconstruction and Expansion Project

Previous Page

Sanwu car parking building ramp electric trace heating project

Engineering Inquiry

Related Products